Earthworks Design, Supervision & Verification in Cumbria
In order to continue development of the next phase of Story Homes Edgehill Park development it was necessary to redirect a high pressure gas main which passed beneath the site. To ensure site levels were maintained, it was necessary to re-engineer the soils beneath the site prior to the construction of a new gas main. Soil sampling and geotechnical analysis to inform materials classification enabled IDG to prepare an Earthworks Specification for the works which took place dur

Nick Ward
Oct 271 min read


Mining investigation in Whitehaven Cumbria
In September 2024 IDG were commissioned by Story Homes to carry out an investigation to assess risks from shallow mining at their...

Nick Ward
Jan 271 min read


Geotechnical Investigation in Kendal
In January 2023, IDG carried out a geotechnical investigation to inform design of a retaining structure at a residential development in...

Nick Ward
Nov 9, 20231 min read


Use of a Detailed Site Chronology to inform a Materials Management Plan
Extensive cut & fill earthworks carried out across several phases at Story Homes development at Edgehill Park, Whitehaven had generated...

Nick Ward
Nov 9, 20232 min read


Slope Stability Assessment - Ulverston
In December 2022, IDG carried out cable percussive and window sample drilling works within a new access road at a residential development...

Nick Ward
Apr 4, 20231 min read


Cable Percussive Borehole & Groundwater Investigation
IDG in partnership with Story Homes have recently completed cable percussive borehole investigations at prospective development sites in...

Nick Ward
Mar 1, 20221 min read


Geonvironmental Investigation Billinge, Lancashire
IDG recently completed a ground investigation including: Trial pitting & trenching to enable in-situ geotechnical testing, & obtain...

Nick Ward
Oct 20, 20211 min read


Mining Investigation Whitehaven
IDG recently completed a detailed rotary drilling investigation to establish the extents of shallow artisanal mineworkings at Whitehaven,...

Nick Ward
Oct 20, 20211 min read


Vale of Eden Ground Investigation
IDG have completed the first phase of ground investigation in lieu of a new housing development in the Vale of Eden. The development will...

Nick Ward
Mar 17, 20211 min read


Site Investigation - Cheshire
IDG have recently been appointed to conduct a Preliminary (Desk Study) Investigation and Geoenvironmental Intrusive Investigation for a...

Brandon Rice-Birchall
Mar 3, 20211 min read


Site Investigation -Stockport
ID-Geo have been appointed by the trustees to prepare a Phase 1 Desk Study Report and undertake an intrusive investigation for a former...

Brandon Rice-Birchall
Jan 29, 20211 min read


Earthworks Project
ID-Geo have been appointed to undertake a source evaluation project and supervise the earthworks for a large commercial project in...