Earthworks Design, Supervision & Verification in Cumbria
In order to continue development of the next phase of Story Homes Edgehill Park development it was necessary to redirect a high pressure gas main which passed beneath the site. To ensure site levels were maintained, it was necessary to re-engineer the soils beneath the site prior to the construction of a new gas main. Soil sampling and geotechnical analysis to inform materials classification enabled IDG to prepare an Earthworks Specification for the works which took place dur
Nick Ward
Oct 271 min read


Mining investigation in Whitehaven Cumbria
In September 2024 IDG were commissioned by Story Homes to carry out an investigation to assess risks from shallow mining at their...
Nick Ward
Jan 271 min read


Geotechnical Investigation in Kendal
In January 2023, IDG carried out a geotechnical investigation to inform design of a retaining structure at a residential development in...
Nick Ward
Nov 9, 20231 min read


Use of a Detailed Site Chronology to inform a Materials Management Plan
Extensive cut & fill earthworks carried out across several phases at Story Homes development at Edgehill Park, Whitehaven had generated...
Nick Ward
Nov 9, 20232 min read